Say you’re about to sign for a kitchen, and the number looks fine. How can you tell it will still be the number when the kitchen is done?
You’ll learn:
- How a builder sets the price for a kitchen renovation
- What a first number can leave out
- What moves a kitchen price up or down
- What you can see in the JobTread portal once the job starts
- How close kitchens stay to their original budget
- What to ask any builder about their numbers
How Does a Builder Set the Price for a Kitchen Renovation?
We build the price from the proposals of the trade partners who will do the work, so we don’t miss the details and the budget is accurate. It starts with a phone call. We ask who referred you and whether you have plans, and we get a feel for how much you want to invest in your home. We talk about budget before we take detailed measurements.

Then we come out to the house with a tablet and a tape measure. If you have plans, we go through them with you. If not, we look at the space and talk through the scope, and we use our experience to tell you what will work and what won’t.
After that, the plans go to all our trade partners so they can price their part of the job. On larger or more complex projects, they come out to the site with us for a second walkthrough. We take their proposals, fill in anything they missed, and put it all into one spreadsheet.
Then we sit down with you and go through every line item, so you understand why the project costs what it does. On one big job, we went through the plans and an 80-line budget sitting in lawn chairs at the property. We would rather give you a realistic number than go in low.
Once the budget and the timeline feel right, you sign off on the budget in JobTread, the software we run our jobs in. That becomes the starting budget we measure every change against.
What Can a First Number for Your Kitchen Leave Out?
Say the old kitchen is torn out, and you’re thinking, “While everything’s open, why not run the hardwood through the rest of the house?” A lot of our homeowners ask us exactly that, and some want the mudroom or a powder room redone while we’re there. That’s new work. A first number can’t include it, so we price it on its own when it comes up.
If your kitchen is part of a larger addition, a first number can also leave out a new electrical service, which can cost around $20,000 on its own. For a project that size, take a look at our home additions and renovations page.
What Moves a Kitchen Price Up or Down?
The 3 choices that move a kitchen price the most are custom cabinets, a new layout, and a bump-out. As a rough guide:
- Keeping the layout with stock cabinets costs the least.
- Our custom cabinets with a new layout put you at about $180,000 and up.
- Add a bump-out, which can need a new foundation, and you’re looking at $300,000 to $350,000 or more.

Our kitchen bump-out in Newtown Square shows how those pieces add up. We pushed the kitchen out 6 feet on a new foundation, and a structural steel beam opens the space.

The counters and backsplash are marble from Marble Crafters, and the Wolf range sits right against the marble. Between the bump-out, the custom cabinets and finishes like these, that kitchen came to about half a million dollars on its own.
What Can I See in the JobTread Portal?
Our JobTread is transparent, so once the job starts, you get your own login. In it, you’ll find the daily logs, the schedule, photos, your selections, and the part of the budget we share with you, so you can follow costs as the job goes. Our clients love being able to see the daily logs, and our page on how we communicate shows what that looks like.
We like to sleep at night, so we’ll open our books to anyone who asks.
How Close Do Kitchens Stay to the Original Budget?
A lot of our kitchens finish within about 5% of the starting budget, unless the scope grows a lot along the way. Big changes are the exception to that 5%. On one kitchen, the first number was around $100,000, and it ended up at $180,000 after all the changes.
2 things help keep our other kitchens close to budget.

The first is the cabinets. We build our custom cabinets in our own shop, so we control their cost and their schedule.
The second is how we handle a change. When something changes, you hear the new price from us as soon as we can get it to you, before you decide to go ahead. We write each change down against your starting budget, with the reason for it, so nothing catches you off guard.
Pennsylvania’s home improvement law has its own rule here: the work in a home improvement contract can’t change unless the owner and the contractor both sign a written change order.
What Should I Ask a Builder Before I Trust Their Number?
Before you trust a builder’s number, ask these questions:
- Where did the number come from: proposals from the trade partners doing the work, or a price per square foot?
- Can I see every line item?
- What does the number leave out?
- What am I signing as the starting budget, and how will you track changes against it?
- Will I be able to see the budget while the job is underway?
- Is this a fixed price, or cost plus, where the price follows the actual costs of the work?
Ready to Start Your Kitchen Budget With McComsey Builders?
If you’re planning a kitchen, start with our kitchen renovations page to see the kind of work we do. When you’re ready, reach out through the contact page on our website, and we’ll talk it through.